Start with one shared equipment group

Availability is unclear, the next person cannot start, and exceptions reach the manager. Start with one property, one equipment type and up to three units; agree how use ends and who handles problems.

Check the cause of congestion first

This rollout is for conflicting information and rules. The operator pays; residents and long-stay guests use the existing seven-language QR booking flow.

If every unit is continuously in use for the time needed, capacity is the constraint. Booking cannot add machines. Record operating hours, available units and waits; do not expand this rollout to solve capacity alone.

Compare two matching weeks

  1. 1. Agree paper rules first

    Define duration, completion checks, extensions, unused bookings, unbooked use and fault contacts. Record one week of improved paper signs and agree responsibilities.

  2. 2. Set up QR booking for the same equipment

    Set slot length, operating hours and daily room limits. Register each unit separately and add completion instructions and a contact. The operator approves notices in two languages.

  3. 3. Have staff verify exceptions

    Users confirm actual completion and cleanup. Compare equipment and bookings before referring overruns, unused bookings or unbooked use to the assigned person. A booking end time is not proof that use has ended.

  4. 4. Compare waiting and fairness too

    Try QR booking for the next week using matching weekdays, hours and available units. Check waits, abandoned attempts and monopolized slots as well as interventions. Separate changed conditions and missing observations.

Post four rules beside the equipment

  • Completion: users confirm cleanup and that the equipment is free. The property decides in advance how belongings left behind are handled.
  • Overruns: state extension conditions and a contact. Staff resolve conflicts when another user has booked the next slot.
  • Unused bookings: agree who checks absence and after how long. Staff check cancellation/refund conditions and change the existing booking manually.
  • Unbooked use or faults: contact staff instead of stopping someone else’s use. Post who handles closures and assisted bookings and when they are available.

Use existing booking, daily limits, assisted booking, instructions and closure dates. This rollout adds no equipment sensors, automatic no-show cancellation or completion alerts.

Read the comparison sheet correctly

Waiting minutes are the sum of observed individual waits. Divide by the number of people whose wait was measured to compare averages; zero observations means unknown. Record usage, observation hours, available units, abandoned attempts, longest wait and changed conditions alongside intervention counts and minutes. Measure from the desired start time agreed in advance to the actual start. Include immediately served users as zero-minute observations; record people unable to start separately as abandoned attempts.

Fewer interventions do not prove success if waiting or fair access gets worse. Keeping improved paper rules is a valid outcome when they solve the problem.

Fill blank worksheets locally. Use property codes, not resident names or phone numbers, in the comparison. This page does not upload entries.

Pricing and optional setup assistance

For Japan-based operators: ¥2,980 per property/month, tax included.

Optional setup: ¥9,900, tax included and quoted in advance. One property, one equipment type, up to three existing units, one notice set in two languages and two total work hours.

Example total for one regular monthly payment plus setup: ¥12,880, tax included. Existing trial, annual and international plan terms apply separately.

The operator approves rules and translations, posts notices and handles daily completion and exceptions. More equipment types, site visits, hardware connections and ongoing operation require separate quotes. Agree scope, staff and schedule before work starts.

Ask about setup assistance (Japanese contact)